A clear report of your energy

Choose a site and period. Review generation, consumption and grid exchange, then download your report.
The preview uses sample data.

Report definition

Sample data
Period
Energy in
Metrics
Period:
7 Oct 2026
Time zone:
Europe/Sofia · UTC+03:00
Currency:
EUR

Preview

24 rows · hourly

↑ Sources↓ Uses490 kWh

Period totals

PV generation
3,396 kWh
Consumption
9,518 kWh
Grid import
6,123 kWh
Grid export
0 kWh
Battery discharge
76 kWh
Battery charge
76 kWh

Estimate at sample day-ahead prices: import 797.72 EUR · export 0.00 EUR

Energy accounts

Six accounts, one closed balance

Each account is measured at a defined point and summed over intervals. Sources must match uses — any rounding difference is shown, not hidden.

Plovdiv demo site · completed day 7 Oct 2026 · Europe/Sofia (UTC+03:00) · sum of 15-minute intervalsSample data
Sources
Account · Measured atEnergy, kWh
PV generationPV metering point and inverters3,395.5
Grid importBilling meter at the grid connection6,123.0
Battery dischargeBattery system metering75.8
Total9,594.3
Uses
Account · Measured atEnergy, kWh
ConsumptionMain switchboard and sub-meters9,518.4
Battery chargeBattery system metering75.9
Grid exportBilling meter at the grid connection0.0
Total9,594.3

PV + import + discharge = consumption + charge + exportRounding difference: 0.0 kWh

PV self-consumption
100.0 %
(PV − export) ÷ PV
Consumption without import
35.7 %
(consumption − import) ÷ consumption
Curtailed generation
0.0 kWh
Reported separately and not counted as generated energy.

Exports

Exports that keep their context

A number without site, period, units and time zone is hard to check. So the context is written into the file itself, ahead of the data rows.

Structure of a sample CSV fileSample data
# Visible Energy · sample data for demonstration
# Site: Plovdiv demo site · PV 1.1 MWp + BESS 2.4 MWh
# Period: 7 Oct 2026 00:00 – 8 Oct 2026 00:00
# Time zone: Europe/Sofia (UTC+03:00)
# Units: energy kWh · price EUR/MWh · currency EUR
Interval,PV generation (kWh),Consumption (kWh),Import (kWh),Export (kWh),Charge (kWh),Discharge (kWh),Average price (EUR/MWh)
… 10 more rows
10:00–11:00,314.8,465.3,150.5,0,0,0,79.68
11:00–12:00,454.3,454.3,14,0,14,0,70.28
12:00–13:00,468.8,465.3,3.8,0,7.3,0,67.9
13:00–14:00,483.5,454.8,0,0,28.8,0,72.54
14:00–15:00,486,464.5,4.3,0,25.8,0,84.95
… 9 more rows

5 context lines · 24 data rows · 8 columns

Bulgarian: “;” separator and decimal comma. English: “,” separator and decimal point.

What the file carries

  1. LabelThe file is marked as sample data.
  2. SiteWhich site, with which configuration.
  3. PeriodStart and end, including the time.
  4. Time zoneZone and offset from UTC.
  5. Units and currencykWh for energy, EUR/MWh for price, EUR for value.
  6. ColumnsEach column carries its unit in the header.

Formats

  • CSVDemo reportsA working download of the sample data with the context above.
  • ExcelProduct · ESS → EnergyThe ESS Energy screen has a Download Excel button for the selected period.
ESS Energy screen: charge and discharge energy and energy to and from the grid in kWh for a selected day, SoC 73%
Battery charge and discharge energy and grid exchange in kWh. Platform screen published on web.visible.energy.
How to read the resultOperational data, modelled savings and financial results.

Kinds of result

Three kinds of result — three different questions

One number cannot be an operational estimate, a modelled saving and a paid amount at the same time. So we show them separately.

Example period

7 Oct 2026 · Plovdiv demo site · PV 1.1 MWp + BESS 2.4 MWh

Sample data

7 Oct 2026: operational estimate 797.72 EUR; modelled saving 5.72 EUR; settled financial result — no data.

Measured

Operational report

797.72 EUR

Estimated net cost of grid exchange (import − export)

Import 6,123 kWh (797.72 EUR) · export 0 kWh (0.00 EUR) at sample day-ahead prices

Answers the question
What happened on site during the period?
Basis
Interval measurements and day-ahead prices
Method
Sum of intervals; value = energy × interval price
When it is available
Shortly after the interval ends
Is it a financial result
No — an operational estimate

Model

Modelled saving

5.72 EUR

Modelled saving against the same period without the battery

Net cost 797.72 EUR with the battery against 803.44 EUR without it (−0.7 %)

Answers the question
What would the difference be against a baseline?
Basis
The same measurements plus a baseline model
Method
Simulate the baseline and compare net cost
When it is available
After the period ends, with a stated method and assumptions
Is it a financial result
No — a modelled estimate with assumptions

Settlement

Settled financial result

No data

There are no invoices or settlement for the sample site, so no financial result is shown.

Answers the question
What was actually paid and received?
Basis
Invoices, settlement data, contract prices and fees
Method
Reconcile invoices with measured quantities and tariffs
When it is available
After invoicing and settlement close
Is it a financial result
Yes — after reconciliation

How the modelled saving in the example is calculated

Method
Every day of the selected period is simulated again without the battery — with the same consumption, PV generation and day-ahead prices. The saving is the difference in net cost of grid exchange.
Baseline
The same site without BESS over the same period.
Assumptions
  • Day-ahead prices are sample values for demonstration.
  • Network fees, excise, VAT and contract terms are not included.
  • The model does not account for charge and discharge losses.
  • Net cost = import value − export value.
Calculation for 7 Oct 2026, EUR
LineWith batteryWithout battery (baseline)
Import value797.72809.11
Export value0.005.67
Net cost797.72803.44
Modelled saving for the period5.72 EUR (−0.7 %)

A modelled estimate on sample data — not a guarantee and not a financial result.

Billing

Visible Energy Billing

web.visible.energy describes the Billing module with four functions: invoices, payment tracking, multi-tariff calculations and allocation of energy and costs across participants.

  1. InvoicesInvoices to participants for the billing period.
  2. Multi-tariff calculationsCalculations when a period has more than one tariff zone or price.
  3. Allocation across participantsEnergy and costs are allocated across several participants — for example, in an energy community.
  4. Payment trackingSee which invoices are paid and which are awaiting payment.
Communities & VPP
Schematic invoice with four zones — numbers and icons match the module's functions. Schematic without values — not a real document.
Data sources and actual reportsMetric traceability and platform screens.

ESG & traceability

Every value has an origin

For ESG reporting a number is not enough. You need the measurement, its source, the method and — for emissions — an explicitly stated emission factor.

  1. 01Measurement

    Available

    Grid import: 6,123 kWh

    Completed day 7 Oct 2026, sum of 15-minute intervals

  2. 02Source

    Stated

    Billing meter at the grid connection

    Site, metering point, interval and time zone

  3. 03Method

    Described

    Import = positive grid exchange × interval duration

    Import and export are summed separately, never netted

  4. 04Emission factor

    Missing

    Not stated

    Needs a value in kg CO₂/kWh, a source, a year and a scope

  5. 05Result

    Not calculated

    CO₂ is not shown

    Without a stated factor and method no value is calculated

Real screens

Financial reports in the interface

The published screens show prices and quantities by product, as well as cost and income by interval.

Exchange report

  • Report for: Exchange — hourly prices and quantities
  • Period by days, months or year; choice of weekdays and hours
  • Block products BASE (1–24), PEAK (9–20) and OFF-PEAK (1–8; 21–24)
  • Add data → Upload files to add data
Exchange report of hourly prices and quantities with Base, Peak and Off-peak products
Report of prices and quantities by hourly and block products. Platform screen published on web.visible.energy.

Cost and income by interval

  • Energy price, supply cost and income from delivered energy
  • Total and average price above the rows
  • The currency is stated in the column header
Table with energy price, supply cost and income from delivered energy by interval
Cost and income by interval based on the exchange price. Platform screen published on web.visible.energy.

These reports value energy at the interval's exchange price. The settled financial result comes with the invoices and settlement.

Questions

Frequently asked questions about reporting

What does an exported file contain?

The site, period, time zone, units and — where there are monetary values — the currency, followed by the data rows. In the demo, the CSV file is marked as sample data. In the product, the ESS Energy screen offers Download Excel.

Why don't you show CO₂ values?

A CO₂ value without a stated emission factor and method cannot be checked. It is shown only when the factor, its source and the method are explicitly set.

Can a modelled saving be used as a financial result?

No. A modelled saving is a comparison with a baseline under stated assumptions. A settled financial result requires invoices and settlement data.

Which time zone do reports use?

Every report states its time zone. The demo data uses Europe/Sofia; in it, days when clocks change have 23 or 25 hours, and intervals are derived from the actual timestamps.

Can I report on several sites together?

In the demo you can choose a portfolio of two sample sites. For real portfolios, see the portfolios and ESCO page.

Let's set up reporting for your site

Tell us which metrics, periods and formats you need. We will show you the relevant reports and the next steps.